Start-up/Commissioning Supervisors
- Location Pirkanmaa
Posted 25.11.2022, 11:00 - Closes 31.01.2025, 23:59
Start-up/Commissioning Supervisors
We are hiring Start-up/Commissioning supervisors for our client´s projects in different locations. The position is fix-term position.
MAIN RESPONSIBILITIES:
Health, Safety and Environmental
– Comply with Customer’s and client’s HSE (Health, Safety and Environmental) rules, as well as with local requirements in the country of the site
– Work in a safe manner without risk to him/her selves, others or the environment
– Obey HSE policy and related instructions
– Comply with site rules
– Report all incidents, near miss cases or HSE risks as instructed o correctly use all required personal protective equipment (PPE)
Commissioning planning
– Before commissioning several preparative actions need to be taken by the project manager, with support from the Commissioning manager and/or commissioning engineer.
– Site control documents to be prepared by Commissioning manager and/or commissioning engineer.
Preparations
– The manager commissioning or applicable resource owners are responsible for appointing the commissioning organization.
– A commissioning schedule is prepared by the commissioning manager/engineer together with the site planner (when applicable) so that commissioning activities can be made in correct order with installation works
– A set of commissioning completion documentation, including erection completion acceptance documentation (ECA), is prepared, when needed, for each unit based on the sequence of start of the different systems
– The commissioning manager/engineer, with support of the project team, provides the necessary commissioning documentation to site
– The commissioning manager/engineer also support the project team in writing/comment on operating and maintenance manuals (“red pen /as-built” Operating & Maintenance manuals)
Check-out
– The commissioning manager is responsible for reporting and updating commissioning progress and activities/findings to project manager
– The commissioning manager hands-over the signed check-out lists/documents to project manager. The commissioning manager is responsible for reporting the feedback of discrepancies into Client´s Continuous Improvement Tool
– The commissioning manager, with support from the Project manager is responsible for informing customer receiving a formal acceptance from the customer of the check-out confirming that the plant is ready for start-up
Start-up
– The commissioning manager, with support from the Project manager is responsible for informing customer that the start-up/test runs of the plant are completed and the plant ready for take-over.
As-build documentation
– The Commissioning manager is responsible to arrange collection of process related documentation which is needed for making the as built documents.
Final acceptance
– If required, a start-up report is written by the Commissioning manager
Demobilization, closing of site
– The construction site should be inspected with regard of left-over goods. The results from the inventory are documented and the Project Manager is notified. The Project Manager decides if the goods should be returned
REQUIREMENTS:
– At least five years of working experience in a similar position as commissioning engineer or similar process equipment’s as a process operator or an operational engineer
– Has a good understanding of commissioning and startup issues
– Worked globally for at least two years in a similar position
– Good knowledge of the Microsoft Office package (Word, Excel, Power Point, etc.)
– Very good level of English (Speaking and writing)
– Has proved to have capabilities to adopt skills outside his/her discipline
Let´s update and discuss about your work situation and your professional priorities and availability. I look forward to hearing from you by phone or email.
Regards,
Seija Tähtinen, Director, HR, Sourcing and Business Operations,
Mobile: +358 44 791 0186,
E-mail: seija.tahtinen@tapro.fi